This re-build was done in 2 phases, first just the rooms then later the Renovations of the Main Area, Pool Area, and Kitchen etc
Both these 2 builds had to be done in record time as the camp was closed on a specific date and then needed to be re-opened again on a specific date. The closing were always during the “off – season”
Relatively small Rooms with extremely clever designs makes this a super nice structure, combined with clever “latte” designs.